b material install 1B

Material and Installation Criteria for Underground Electrical Systems


Alameda Municipal Power has a definitive set of guidelines for builders, addressing roles and responsibilities as well as materials and installation guidelines for conforming to city code.


Click here to download the Material and Installation Criteria (pdf)


TABLE OF CONTENTS


I. GENERAL NOTES FOR UNDERGROUND ELECTRICAL INSTALLATIONS


II. RULES AND REGULATIONS


III. CONSTRUCTION INSPECTION


IV. INSTALLATION OF MATERIAL AND EQUIPMENT


V. REFERENCE DRAWINGS

  • Call (510) 748-3900 for Customer Service 24/7
  • Privacy Policy
  • Copyright© 2002-16 Alameda Municipal Power


    <